This in effect involves a reservoir that will be built on the 14,000 acre A-2 parcel adjacent to the existing A-1 basin constructed in 2015, and it will capture excess water from the lake and eliminate the discharges of polluted water. The new reservoir will allow storage of 240,000 to 360,000 acre ft will dwarf the A-1 basin’s 60,000 acre ft capacity.
PUBLICITÉ