This new line runs in a combination of underground section and on elevated structures including 2 new stations at Ocean Park and Wong Chuk Hang, 1,9 km of new elevated viaduct and a new bridge of 247 meters spanned the Aberdeen Channel Bridge.
PUBLICITÉ
Another key aspect, the visual impacts were treated sensitively, the noise barrier design is fully integrated with the overhead line and trackside auxiliary system, reducing in the overall width and height of the railway viaduct.
“I’m proud to be part of the team to bring the transportation and convenient travel means to the local community and visitors alike” said Lee Leronimo, Atkins’ project Manager.