The newly-built electric double-track railway will stretch from Gemas Station to Johor Bahru Central Station. The project will cover 191km of tracks, nine new passenger stations, two rolling stock depots and three open stations.
PUBLICITÉ
The full line, with a designed speed of 160kmph, will be covered by meter-gauge ballast seamless tracks.