This solution can reproduce 100% of the tests typically run in the workshop. The project aims to reduce to a minimum the installation footprint while simultaneously absorbing a test on an increasing volume of trains. The oar is placed on a rolling carpet simulating movement on a route while replicating the interaction with the different signage system of the network. The layout of the structure has ensured a water management in particularly in recovering and in the recycling, and thus the infrastructure design had incorporated the elements of the HQE (relating to the choice of materials and the future maintenance).
PUBLICITÉ