This € 410 million contract, entrusted to a group managed by Blythe (60%), an Eurovia subsidiary, associated with Zachry Construction Corporation (40%), deals with the renovation of existing road and the construction of two additional lanes. Work will start in spring 2018 for a period of 4 years and will mobilize 350 people. There are 800,000 cubic meters of earthworks, 1.1 million square meters of concrete pavement, 670,000 t of asphalt and the construction of 6 bridges and a railway viaduct above the highway.
PUBLICITÉ